Minimal time and crew – Maximum quality and Profit!

Doing more with less…

  • Dormers and return gables preassembled.
  • Roof panels fully sheathed inside factory.
  • Entire sheathed roof set in less than 2 hours with a 4 man crew. Save on crane time, waste and manpower while providing for a much safer and cleaner jobsite.